The company was established in December 2005 in the North Kazakhstan region. and the company was called Ualikhan-Kurylys. In 2006, the company made a major overhaul of the school, from 2007 to 2008 installed a drinking water supply for the Elevator. In the period from 2008 to 2011, a lot of work was done by subcontracting on the construction of residential complexes in the city of Almaty, including the construction of the eastern highway, where the KUAT Corporation was the general contractor. Our first steps in a new direction of construction began for us in 2011, our company received a contract for the construction of an access railway to Neftebaz at Dostyk station (a border station with the Republic of China). The complexity of this project was that according to the project, the rail gauge was -1435 mm, and all our equipment, including measuring instruments, were for the gauge of the CIS countries, that is 1520 mm. The engineering staff and project managers needed to accelerate courses in the city of Alashonkou (PRC), purchase equipment and measuring instruments. Our Chinese colleagues happily shared with us with 1435 mm standards. At the end of 2012, our company successfully completed the project and at the same time launched the first trains from the Republic of China. In fact, 2012 was a year of verification for our company and our guys, for this year we commissioned three facilities at once: Neftebazy Access Railways in Dostyk (customer of Dostyk Refinery LLP). Access railways for the metal storage base in Balkhash (customer of KSP Steel LLP). Access railways of the Mynaralsky cement plant in the village of Minaral (customer of ZhTsPK LLP, general contractor of ADS-Company). In 2013, the founders of the company gave a new name - the Group of Railwaymen of Kazakhstan. This year, the company was given a new impetus and a new contract for the construction of on-site railway tracks and an access road on the Aktogai copper project of KAZ Minerals Aktogay LLP. During the cooperation with KAZ Minerals Aktogay LLP, we have built and commissioned the following facilities: On-site railways - 9.6 km. Railroad crossings -10 pcs. Wagon scales - 1 pc. Culverts -17 pcs. Category III highway - 14.5 km. Runway -1 pcs. Quarry development - 1 quarry.
Make a safe deal with this supplier.
Apply
About company
Categories: | Address: |
---|---|
Road Construction Machines & Equipments, Bridges and Tunnels (design, construction), Road Construction Machinery and Leasing, Road Surface, Road Construction, Home & Construction, Railway transport | Kazakhstan, Астана, г.Астана, Есильский район, ул.Достык 20, БЦ Санкт-Петербург |
Contact supplier
Supplier:
"Узлегпром"
Product:
Supplier:
Min. order:
Directory
Marketing department:
Marketing department:
Marketing department:
Information
Inform manager that you found the product on Qoovee
The contact details of the supplier is not available!
Send message